See also: Bathroom Priorities Bathroom Diagrams Bathroom To-do
Calendar
- July 27-30 - Large window arrives (will call at Windows, Doors & More in Ballard)
- July 30 - Julie arrives 11am
- July 30 - Rafael roof patched -- arrives 9-10am
- July 30 - Install windows, Electric, HVAC
- July 31 - Aug 6 - Dry wall & Tile
- Aug 2 - All tile except pebble should arrive
- Aug 7 - Pebble tile should arrive
- Aug 7 - Aug 13 - Finishing
- Aug 11 - Sink cuts completed by Meyer Wells
Done
- July 12 - Shelf supports arrive - Hardware Supply (recieved))
- July 20 - Tankless water heater, new furnace installed (installed)
- July 21-30 - Tub faucet arrives (received)
- July 25 - Shelves ready (received)
- July 25th - Aug 15 - Tracy and Harlan in Seattle
- July 26th - Tub arrives by this date (received)
- July 27 - chimney removed
- July 27 - floor removed, most demo completed
- July 28 - Panel taken to Meyer Wells
- July 28 - Pick up Solatube
- July 29 - Tile ordered
- July 29 - Furnace installed
- July 26-30 - Toilet arrives (received)
First draft
Parts & Supplies
Purchased by Harlan
99.43 - Home Depot 7/28
213.51 - Lowes 7/28
16.44 - Lowes 7/29
85.00 - Lowes 7/29
11.98 - Home Depot 7/29
6.95 - Home Deport 7/30
162.22 - Dunn Lumber 7/30
97.31 - Home Deport 7/30
45.93 - Dunn Lumber 7/31
32.35 - Dunn Lumber 7/31
Items still to be obtained:
- Shower faucet
- Moen good
- thermostatic? Or just temperature balanced?
- Recessed lighting
- Fans
Already obtained
- Tub - received, 77 gallons
- Tub faucet - received
- Sink - recieved
- Sink Counter - received
- Sink Faucet - Probably go with the one that came with sink, may replace later
- Tile - Sizing/counting not quite completed (all have 1-2 day lead time, except 22 PEBBLE, 1 week)
- Okay to order all but pebbles when Kemal returns 7/26? (1-2 day lead time)
- Tile pictures
- East wall = 31CS (rough rock, slate, gray & red, interlocking) (picture)
- 7x14 @ $8.21/SF x 6'x8.25'=50' 50'x$8.21=$410 (+15% -tub)
- Floor = 98MASS (black "midnight mis" slightly rocky porcelain)
- 12x12 @$7.46/SF x 62 SF (70 SF - non-partial pebble tiles) = $463
- Floor accents = 22 PEBBLE (polished black pebble, "vivid black") (picture)
- 12x12 sheets @ $14.03/SF x 13 SF = $182
- Lower wall, tub surround, shower = 98MAGA ("walnut" porcelain, red with black highlights) (picture)
- 6x6 @ $5.89 SF x 112.5 SF (450 tiles) = $663
- 6x6 bullnose @ $5.76 EA x 89-N pieces = $513
- 6x3 bullnose @ $5.76 EX x N pieces
- (Need to recalculate above based on cheaper option of using 6x3)
- 6x6 double bullnose @ 8.80
- (Tub deck is 19" high, tub overall is 21" high and 32" wide)
- Shelves - 5' 4' and 3' shelves from Meyer Wells, alder from a Mukilteo private residence, received
- Contact = Matt Spenny, matthew@meyerwells.com, 206 303 7139
- Shelve supports - received, from Builders' Hardware Supply
- Meyer Wells recommend angle iron (vertical portion to be under wall tiles) 4 inches wide (5 14" with holes 12" apart?)
- Angle iron may not be needed? Tracy leaning toward building blocking into wall
- Toilet - received
- Eco Toto Drake - black (use seat from existing toilet)
- Ordered via James at Terry Love Plumbing on 6/30
- Tankless Water Heater - Installed
- Brian est. - $700 for model that lasts 12-15 years; $2k for better quality; pay for selves in 6-9 years
- Linear/channel shower drain, pan, etc. - Purchased from Seattle Glass Block received
- 6029 238th St SE, Woodinville
- Box is 4' x 5' Pan will need to be trimmed (with circular saw)
- Gal at Glass Block can advise when Tracy arrives
- Large outer window (just above tub) - fiberglass, not yet identified, approximate 5' wide and 4' tall
- Tracy recommends Jeld-Wen (many in stock at Home Depot)
- (Place on Interbay?)
- Small outer window (left of sink) - not yet identified
- This would allow some light from bathroom window through kitchen
- May consider a nice salvage window from somplace like Seattle Salvage?
- Lighting - Check out Sustainable, 2000 NW Market, 206 782-8888, for wall models?
- Mirror - To be obtained from Sustainable (pic)
- Tools needed to rent?
- Bond brake? Strengthen floor?
- Partition - From Meyer Wells, received
- Will need to figure out how best to attach, whether to add any hardware to either side
- Need price, delivery date commitment from Meyer Wells
- Cabinet?
- Shelves?
- Glass blocks for window in kitchen wall?
- Towel holders? Wash cloth holders?
Vendors & Links
- Meyer & Wells - Cool reclaimed wood, e.g. for shelves
- Terry Love Plumbing - includes links for Seattle area show rooms
- Ambia (sp?) just west of Latona Tavern
- Hubbard & Forge - lighting
- Juan - mexican laborer who may be able to help with chimney demolition. 562 686 6323 Not real good english so brush up on your Spanish. Good worker. He was not actually the person who helped on mine. May need some coaching with how you want things set up to protect furnace and to take care as the chimney is brought down from the top.
- Roof Care by Rafael 206 390-2942 e-mail: rafaelsroofcare@yahoo.com
- Kemal - gets good pricing at Seattle Tile - 206 412-4466 - out of country 6/29-7/26
- Angle Iron
Misc. Guidelines
Walkways minimum of 36"
Tile
East wall = 31CS (rough rock, slate, gray & red, interlocking)
- 7x14 @ $8.21/SF x 6'x8.25'=50' 50'x$8.21=$410 (+15% -tub)
Floor = 98MASS (black "midnight mis" slightly rocky porcelain)
- 12x12 @$7.46/SF x 62 SF (70 SF - non-partial pebble tiles) = $463
Floor accents = 22 PEBBLE (polished black pebble, "vivid black")
- 12x12 sheets @ $14.03/SF x 13 SF = $182
Lower wall, tub surround, shower, backsplash = 98MAGA ("walnut" porcelain, red with black highlights)
- 6x6 @ $5.89 SF x 112.5 SF (450 tiles) = $663
- 6x6 bullnose @ $5.76 x 89 = $513
- 6x6 double bullnose @ 8.80
Bathroom Remodel - Obsolete Research Stuff
Comments (0)
You don't have permission to comment on this page.